Deutsch | English
Home > Technics > Special Equipment > 69.70 MIS overview - Virtual ROBELity 360 degree video

69.70 MIS overview - Virtual ROBELity 360 degree video

31.07.17 | 01:25 | 574 Views

The Mobile Maintenance System ROBEL 69.70 is a self-sufficient track maintenance "workshop on wheels".

An engineering train with the capability to deliver labour, plant, power and materials directly to the worksite. 

It's unique design allows access to the track offering a well illuminated, safely cocooned, working environment protected from weather and trains passing on the adjacent track. 

With the opportunity to work under live OHL, with adjacent lines open and using the signalling system for protection, the train enables quality maintenance in the most difficult track areas.



more info about 69.70 MIS overview - Virtual ROBELity 360 degree video

 
videos: Special Equipment
69.40 Traction & Supply Unit at the MIS69.40 Traction & Supply Unit at the MIS

The high performance Traction and Supply Unit ROBEL 69.40 comes equipped ...

31.07.17

69.45 Intermediate Wagon at the MIS69.45 Intermediate Wagon at the MIS

Materials and equipment handling is managed in the Intermediate Wagon ROBEL ...

31.07.17

69.50 Mobile Maintenance Unit at the MIS69.50 Mobile Maintenance Unit at the MIS

The business end of the train is the Mobile Maintenance Unit ROBEL 69.60 ...

31.07.17

Replacing rails with the 69.70 MISReplacing rails with the 69.70 MIS

The future of track maintenance - ROBEL’s approach for replacing rails: A ...

31.07.17

Eliminating wet bays with the 69.70 MISEliminating wet bays with the 69.70 MIS

The future of track maintenance - ROBEL’s approach for eliminating wet bays:

31.07.17

Track geometry repairs with the 69.70 MISTrack geometry repairs with the 69.70 MIS

The future of track maintenance - ROBEL’s approach for track geometry repairs:

31.07.17

Re-baseplating with the 69.70 MISRe-baseplating with the 69.70 MIS

The future of track maintenance - ROBEL’s approach to re-baseplatings: ...

31.07.17

ROBEL REXS – Systematic Rail LoadingROBEL REXS – Systematic Rail Loading

It takes ROBEL about 6 minutes to show how rails are loaded smoothly. Have ...

16.09.16

Vertical Tamper 62.05 - Start-Up InfoVertical Tamper 62.05 - Start-Up Info

Good preparation pays half the rent!

01.04.16

The MMS 69.70 conceptThe MMS 69.70 concept

Safety, that pays off

24.04.13

MMS 69.70MMS 69.70

Safety that pays off

22.04.13

MMU 69.60 UIC compactMMU 69.60 UIC compact

Safety that pays off

22.04.13

MMS 69.70 UICMMS 69.70 UIC

Safety that pays off

27.03.13

Mobile Maintenance System 69.70Mobile Maintenance System 69.70

Safety, Quality, Cost-efficiency

17.09.12

Rail Train 40.61/40.63Rail Train 40.61/40.63

For quick and economic loading, unloading and transporting of long welded rails

14.08.08

 
 
show more show more