Deutsch | English
Home > Technics > Special Equipment > ROBEL REXS – Systematic Rail Loading

ROBEL REXS – Systematic Rail Loading

16.09.16 | 06:40 | 2091 Views

It takes ROBEL about 6 minutes to show how rails are loaded smoothly. Have a look!

 How do you get long welded rails to the track in perfect quality? ROBEL has the answer. 

The Rail Exchange System REXS is the advancement of the well-proven ROBEL rail train concept: 

  •  Gentle unloading and loading within the bending and stress limits 
  •  High process speed with a minimum of staff 
  • More safety due to the automation of the working processes 

It takes ROBEL about 6 minutes to show how rails are loaded smoothly. Have a look!

more info about ROBEL REXS – Systematic Rail Loading

 
videos: Special Equipment
Vertical Tamper 62.05 - Start-Up InfoVertical Tamper 62.05 - Start-Up Info

Good preparation pays half the rent!

01.04.16

The MMS 69.70 conceptThe MMS 69.70 concept

Safety, that pays off

24.04.13

MMS 69.70MMS 69.70

Safety that pays off

22.04.13

MMU 69.60 UIC compactMMU 69.60 UIC compact

Safety that pays off

22.04.13

MMS 69.70 UICMMS 69.70 UIC

Safety that pays off

27.03.13

Mobile Maintenance System 69.70Mobile Maintenance System 69.70

Safety, Quality, Cost-efficiency

17.09.12

Rail Train 40.61/40.63Rail Train 40.61/40.63

For quick and economic loading, unloading and transporting of long welded rails

14.08.08

 
 
show more show more